H - Electricity – 02 – J
Patent
H - Electricity
02
J
H02J 4/00 (2006.01)
Patent
CA 2097120
REMOTE LOAD MANAGEMENT AND FAULT ISOLATION SYSTEM ABSTRACT A remote load management and fault isolation system is provided for use with an electrical distribution network in which a computer communicates with the system for remotely controlling the flow of multi-phase electrical power through separate utility pole-mounted conductors. A terminal unit is mounted in a cabinet near the base of the utility pole and receives electrical signals representative of the current and line voltage associated with each of the conductors from a plurality of sensors mounted near the top of the pole. A two-way communication device relays the network information to a remote master computer, and the master computer generates a control signal which is relayed back to the terminal unit. An automatic control in the cabinet operates a motorized disconnect switch for selectively interrupting the flow of power in the conductors in accordance with the control signal generated by the remote computer.
Bridges Ronald P.
Finlayson & Singlehurst
LandOfFree
Remote load management and fault isolation system does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Remote load management and fault isolation system, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Remote load management and fault isolation system will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1731707