H - Electricity – 04 – W
Patent
H - Electricity
04
W
H04W 52/30 (2009.01) H04W 84/12 (2009.01) H02J 7/00 (2006.01) H02J 7/35 (2006.01)
Patent
CA 2644962
A mesh node of an infrastructure wireless local area network 'WLAN' is coupled to a battery which is coupled to a device that is able to harness energy from a source of renewable energy. Energy management of the mesh node includes conducting simulations of a system comprising the mesh node, the device, and the battery in its current state of charge, determining an admissible load for the mesh node from the simulations, and withholding communication services by the mesh node for one or more periods of time a cumulative duration of which is related to power consumption of the mesh node when handling the admissible load. The simulations involve meteorological data related to the source of renewable energy in the vicinity of the mesh node.
Farbod Amin
Sayegh Amir A.r.
Todd Terence D.
Integral Ip
Mcmaster University
LandOfFree
Resource allocation and outage control for renewable energy... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Resource allocation and outage control for renewable energy..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Resource allocation and outage control for renewable energy... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1881558