CA 2341925
Frac sand from a well completion operation is transported to a recycling facility by truck. The frac sand is passed into a washing facility where is it separated from frac sand carrier residue, clays, drilling mud and metal particles. The wash water used in the washing facility is settled and re-used. Mud from the settled wash water is removed and re-used in drilling operations. The frac sand is removed from the washing facility by an inclined de- hydration screw, and discharged into a counterflow hot air drying facility. Dust from the drying facility is collected and removed. Hot frac sand from the drying facility is passed through a chiller, and collected. The collected material is sized, and stored for re-use.
Kress Keith
Leeson Dale H.
Neal John
Skarstol Stephen K.
Blake Cassels & Graydon Llp
Encana Corporation
Pancanadian Petroleum Limited
LandOfFree
Slurry recovery process does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Slurry recovery process, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Slurry recovery process will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1722231