E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
166/33
E21B 43/20 (2006.01) C09K 8/42 (2006.01) E21B 33/16 (2006.01)
Patent
CA 1158546
ABSTRACT Specification discloses a process for completing a wellbore into a subterranean reservoir. In completing the wellbore, a completion fluid is pumped into the well- bore casing to displace the mud contained therein, the improvement comprising pumping a spacer system into the wellbore casing before pumping the completion fluid into the wellbore. The spacer system comprises a spacer fluid having a viscosity sufficiently high such that the spacer fluid exists in either laminar or plug flow at normal cir- culation rates.
372388
Gowling Lafleur Henderson Llp
Standard Oil Company
LandOfFree
Spacer system useful in brine completion of wellbores does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Spacer system useful in brine completion of wellbores, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Spacer system useful in brine completion of wellbores will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-274441