E - Fixed Constructions – 02 – B
Patent
E - Fixed Constructions
02
B
E02B 8/06 (2006.01)
Patent
CA 2744723
A liner is formed in an excavated spillway by providing a plurality of rectangular flexible liner sections with each liner section having a parallel series of elongated continuous and adjacent tubular pockets pre-filled with a dry cementitious material or a fine granular material. The liner sections are provided with a surrounding generally flat perimeter boarder. The liner sections are laid into the spillway with their boarders overlapping and the boarders are secured together with the tubular pockets aligned in the same direction to form a continuous liner blanketing the spillway. The tubular pockets are arranged in the spillway with their elongated sides presented to the expected direction of water flow in the spillway. The liner sections may be anchored to the spillway with anchor pins.
Breedlove John J.
Breedlove Michael John
Heintzmann Corporation
Marks & Clerk
LandOfFree
Spillway liner and method does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Spillway liner and method, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Spillway liner and method will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1781286