E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/24 (2006.01)
Patent
CA 2277378
A pair of vertically spaced, parallel, co-extensive, horizontal injection and production wells and a laterally spaced, horizontal offset well are provided in a subterranean reservoir containing heavy oil. Fluid communication is established across the span of formation extending between the pair of wells. Steam-assisted gravity drainage ("SAGD") is then practised by injecting steam through the injection well and producing heated oil and steam condensate through the production well, which is operated under steam trap control. Cyclic steam stimulation is practised at the offset well. The steam chamber developed at the offset well tends to grow toward the steam chamber of the SAGD pair, thereby accelerating development of communication between the SAGD pair and the offset well. This process is continued until fluid communication is established between the injection well and the offset well. The offset well is then converted to producing heated oil and steam condensate under steam trap control as steam continues to be injected through the injection well. The process yields improved oil recovery rates with improved steam consumption.
Coates Roy
Cyr Ted
Polikar Marcel
Alberta Science And Research Authority
Coates Roy
Cyr Ted
Johnson Ernest Peter
Polikar Marcel
LandOfFree
Steam-assisted gravity drainage heavy oil recovery process does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Steam-assisted gravity drainage heavy oil recovery process, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Steam-assisted gravity drainage heavy oil recovery process will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-2046510