Switch clearing system

E - Fixed Constructions – 01 – B

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

E01B 7/20 (2006.01) B08B 5/02 (2006.01) E01B 7/24 (2006.01) E01B 19/00 (2006.01)

Patent

CA 2273045

An air blowing system for use in keeping railroad track switches clear of snow utilizes flexible tubes, preferebly of rubber or plastic, located transversely beneath the main tracks, and connecting with resilient nozzles to direct a high flow of air in the direction of the track switch points. The system may include resilient ducts conveying air in protective relation with the switch control rods extending laterally beneath the track. The rod protective air discharge may be by way of a louvered cross-tube, extending parallel with the rods, to discharge air laterally of the rods, or one or more nozzles discharging air longitudinally of the rods.

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

Switch clearing system does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with Switch clearing system, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Switch clearing system will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-1518353

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.