G - Physics – 05 – B
Patent
G - Physics
05
B
G05B 19/04 (2006.01) G05B 19/418 (2006.01)
Patent
CA 2168083
An ideal production start plan is worked out from the time interval required from a production start till a shipment and a delivery term. In addition, a satisfaction degree which represents a degree of permission of a deviation from an ideal production start time instant, is obtained. When it is impossible to start production of a plurality of different product items at a time in an ideal plan, a preferential product item is determined by referring to the satisfaction degree. In this way, an actual plan is worked out from the ideal plan. The actual plan which is obtained in this way is capable of execution and close to the ideal plan.
Gowling Lafleur Henderson Llp
Toyota Jidosha Kabushiki Kaisha
LandOfFree
System for and method of working out production start plans does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with System for and method of working out production start plans, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and System for and method of working out production start plans will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1746048