E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
166/39
E21B 43/24 (2006.01) E21B 43/16 (2006.01) E21B 43/40 (2006.01)
Patent
CA 1192487
-21- ABSTRACT A process for the production of heavy oil from a subterranean oil reservoir by the injection of a hot aqueous fluid into the reservoir and the injection of a diluent solvent down the production well to produced a blend of solvent and oil having a decreased viscosity. The reservoir oil has a density greater than the density of water. The diluent solvent has a density such that the density of the resulting blend recovered from the production well also has a density greater than the density of the water. The water produced from the production well is separated from the blend and the blend then fractioned to recover a solvent fraction of the requisite density. This solvent fraction is then returned to the production well to produced additional blend within the well in a continua- tion of the process.
413123
Anderson Ardis L.
Boyer Lyndon D.
Britton Michael W.
Conoco Inc.
Ridout & Maybee Llp
LandOfFree
Thermal oil recovery with solvent recirculation does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Thermal oil recovery with solvent recirculation, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Thermal oil recovery with solvent recirculation will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1246414