E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
31/32
E21B 33/13 (2006.01) C09K 8/508 (2006.01) C09K 8/60 (2006.01) E21B 43/12 (2006.01) E21B 43/22 (2006.01)
Patent
CA 2028221
TREATING UNDERGROUND FORMATIONS ABSTRACT D# 79, 250 -F Wells penetrating oil-producing and water-producing intervals may be treated in order to reduce the flow rate of water into the well by isolating the water-producing interval and introducing into it a volume of treating fluids sufficient to invade at least six inches into the permeable formation comprising the water-producing interval. Cased wells may be treated to plug holes in the casing caused by corrosion or casing breaks by introducing a treating fluid into the formation adjacent to the break. The treating fluid comprises a material which can be acid catalyzed in a period of from 1 to 16 hours at formation conditions, preferably a monomer or oligomer of furfuryl alcohol. The treating fluid contains from 40 to 60 percent furfuryl alcohol and from 40 to 60 percent of an ester, preferably ethyl acetate or butyl acetate. The catalyst is preferably orthonitrobenzoic acid or toluene sulfonic acid in a concentration of from 1 to 4 percent by weight. The acid and concentration of acid are selected to produce a set time at the formation temperature in the range of from 1 to 16 hours, so the treating fluid will flow into and saturate the pore space of the portion of the formation being treated. C79250 92790
Friedman Robert Harold
Surles Billy Wayne
Gowling Lafleur Henderson Llp
Texaco Development Corporation
LandOfFree
Treating underground formations does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Treating underground formations, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Treating underground formations will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1982084