E - Fixed Constructions – 21 – D
Patent
E - Fixed Constructions
21
D
61/61
E21D 9/00 (2006.01) E02D 29/05 (2006.01)
Patent
CA 1338281
According to the present invention, tunnels, particularly shallow tunnels, are constructed by excavating slurry filled cross-trenches in a direction transverse to the axis of the tunnel and at regular intervals along the line or axis of the tunnel. Prefabricated frame elements are inserted into the cross-trenches to, in essence, create the tunnel wall lateral support structure before the tunnel walls are installed. Then the tunnel sidewalls are excavated under bentonite clay or mud slurry to form cross-slots between the previously installed support frames. Precast concrete sidewalls or panels are inserted between the support frames. The frames and sidewalls have interlocking tongue and groove or keyway structures so as to interfit and lock same into position. When the sidewalls are in place, the roof of the tunnel may be either cast in place and then the soil excavated to form the actual tunnel and then the floor cast or the tunnel may be excavated down to the floor or invert level and then the floor or inverts cast and then the roof cast.
595741
Miotti Giosue
Borden Ladner Gervais Llp
Finic B.v.
LandOfFree
Tunnel construction apparatus and method does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Tunnel construction apparatus and method, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Tunnel construction apparatus and method will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1307099