User interface for scheduling resource assignments

G - Physics – 06 – Q

Patent

Rate now

  [ 0.00 ] – not rated yet Voters 0   Comments 0

Details

G06Q 10/00 (2006.01)

Patent

CA 2717324

A project management resources scheduling user interface is provided in which resource information may be displayed in a condensed timeline for each resource over the duration of a project. Individual tasks or groups of tasks displayed in the project management resources scheduling view may be moved from one resource to another resource while respecting project constraints and dependencies. Unassigned and unscheduled tasks may be dragged onto the scheduling view and may be dropped on a given resource in a timing location required by the project. Tasks may be viewed according to a hierarchical relationship between tasks of a given project. The scheduling view may be used in combination with a Gantt chart view of project tasks for allowing a view of both task-based and resource-based scheduling.

Linvention concerne une interface utilisateur de planification de ressources de gestion de projet permettant laffichage dinformations de ressources dans un tableau chronologique condensé pour chaque ressource sur la durée dun projet. Les tâches individuelles ou les groupes de tâches affichés dans la vue de planification des ressources de gestion de projet peuvent être déplacés dune ressource à une autre tout en respectant les contraintes et les dépendances du projet. On peut faire glisser et déposer les tâches non attribuées et non planifiées sur la vue de planification et sur une ressource donnée à un emplacement dans le temps requis par le projet. Les tâches peuvent être vues selon une relation hiérarchique entre les tâches dun projet donné. La vue de planification peut être utilisée en combinaison avec une vue de graphique de Gantt de tâches de projet pour permettre la vue dune planification à la fois basée sur les tâches et basée sur les ressources.

LandOfFree

Say what you really think

Search LandOfFree.com for Canadian inventors and patents. Rate them and share your experience with other people.

Rating

User interface for scheduling resource assignments does not yet have a rating. At this time, there are no reviews or comments for this patent.

If you have personal experience with User interface for scheduling resource assignments, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and User interface for scheduling resource assignments will most certainly appreciate the feedback.

Rate now

     

Profile ID: LFCA-PAI-O-1940648

  Search
All data on this website is collected from public sources. Our data reflects the most accurate information available at the time of publication.