E - Fixed Constructions – 21 – C
Patent
E - Fixed Constructions
21
C
E21C 41/16 (2006.01)
Patent
CA 2041520
The invention relates to a cut-and fill method of a mine, where the working is done by pillar working, which propagates verti- cally downwards. The working is done by placing the stope and the pillars interlaced with each other when propagating downwards. The pillars are made by the hardening fill- method and likewise, at the bottom of the excavated stope, in the lower corners, a bed of hardening fill is made.
Aaro Lars-Erik
Edeblom Nils Edvald
Lindqvist David Ragnar
Marttala Karl-Erik
Seppanen Pentti Sakari
Aaro Lars-Erik
Edeblom Nils Edvald
Lindqvist David Ragnar
Marttala Karl-Erik
Outokumpu Oy
LandOfFree
Vertically downwards propagating pillar working does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Vertically downwards propagating pillar working, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Vertically downwards propagating pillar working will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1928444