E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/16 (2006.01) E21B 41/02 (2006.01) E21B 43/12 (2006.01) E21B 43/38 (2006.01)
Patent
CA 2277566
A technique is disclosed for completion of a well, such as an oil and gas production well. A packer is positioned in the well to divide the well into upper and lower zones. The packer has multiple passageways between the upper and lower zones. A pumping system is positioned in the lower zone for displacing wellbore fluids flowing from a production formation. The pumping system may include a liquid/gas separator, and express gas-phase components through one of the passageways and liquid-phase components through another. A conduit conveys the gas-phase components to a desired location. The liquid-phase components are conveyed to a collection location in the annular region surrounding the conduit. The conduit may be used for positioning a chemical injection line within the well, or for receiving a parameter sensing unit. The chemical injection and parameter sensing may be performed independently of gas production, and without interruption of either gas or liquid production.
Camco International Inc.
Marks & Clerk
LandOfFree
Well completion system employing multiple fluid flow paths does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Well completion system employing multiple fluid flow paths, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Well completion system employing multiple fluid flow paths will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1440477