E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
166/17
E21B 33/14 (2006.01) C04B 28/26 (2006.01) E21B 31/03 (2006.01)
Patent
CA 1123725
ABSTRACT A method of well completion is provided which enables much of the well casing to be later recovered from the well in the event the well is later abandoned, or where intermediate casing must be run during drilling of the well but may later be removed when the liner is in place. The well is completed by any of several embodiments of manipulative steps, leaving the lower portion of the annulus filled with a conventional cementitious material and the upper portion of the annulus filled with an aqueous gel comprising effective quantities of water, a water soluble alkali metal silicate, and a water soluble metal compound capable of releasing a multivalent metal cation to react with the water soluble silicate. An economically significant portion of the casing can thereafter be recovered if necessary after first severing the casing above that portion adjacent the set cementitious material where an intermediate string of casing is employed only to facilitate drilling of the remainder of the well, the cement may be omitted with respect to the intermediate string, as is known in the art. 27,590-F
342125
Free Dustin L.
Griffin Thomas J. Jr.
Morris Earl F.
Root Roland L.
Smart & Biggar
The Dow Chemical Company
LandOfFree
Well completion with casing gel does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Well completion with casing gel, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Well completion with casing gel will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-622185