G - Physics – 05 – D
Patent
G - Physics
05
D
342/31, 342/22.1
G05D 7/06 (2006.01) E21B 43/12 (2006.01)
Patent
CA 1338022
A programmable system for controlling the operation of a plunger completion oil or gas production well to optimize production from the well. The controller operates one or more motor valves controlling the well in accordance with programmable values of off-time, on-time and exhaust-time. The controller monitors whether or not a plunger arrival signal is received on each cycle of intermitting the well and changes either the off- time or the exhaust-time for the next cycle in response thereto. In oil well mode, the off-time is decreased slightly for each cycle following a cycle in which plunger arrival occurred and increased slightly for each cycle following one in which it did not. In gas well mode, the exhaust-time is increased slightly for each cycle following a cycle in which plunger arrival occurred before on-time expired and decreased slightly for each cycle following one in which it did not.
609051
Crow Robert W.
Holloman Ricky M.
Pruden James B.
Company Halliburton
Riches Mckenzie & Herbert Llp
LandOfFree
Well production optimizing system does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Well production optimizing system, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Well production optimizing system will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1242252