B - Operations – Transporting – 65 – G
Patent
B - Operations, Transporting
65
G
B65G 7/00 (2006.01) E04G 21/14 (2006.01) E04H 12/34 (2006.01) F03D 11/00 (2006.01)
Patent
CA 2652649
The disclosure relates to preassembled equipment (2) and a method of transporting bulky equipment (2) of a wind power plant (1) from a preassembly site to an installation site, the equipment (2) comprising at least two modules (3, 4), the method comprising the steps of preassembling the modules (3, 4) onto a support (6), wherein the modules (3, 4) are placed at a first distance (D1) from another, transporting the support (6) with the modules (3, 4) from the preassembly site to the installation site, and at the installation site, displacing the modules (3, 4) and fixing them at the support (6) at a second distance (D2) being greater than the first distance (D1). While the equipment (2) provides for sufficient space, e.g. for maintenance aisles, in its unpacked form, by transporting it in a preassembled and packed form, transportation and installation are considerably simplified.
Company General Electric
Craig Wilson And Company
LandOfFree
Method of transporting bulky equipment of a wind power... does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method of transporting bulky equipment of a wind power..., we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of transporting bulky equipment of a wind power... will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1568109