E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
E21B 43/24 (2006.01) E21B 43/30 (2006.01)
Patent
CA 2710078
A process for increasing the efficiency of hydrocarbon recovery from an underground formation containing viscous hydrocarbons through the use of both gravity drainage and mobile water drive. The process comprises a pair of vertically-spaced horizontal wells and a laterally offset horizontal well. A heated fluid is injected into the formation via a first well pair, and an adjacent horizontal well creates a pressure sink to draw the heated fluid laterally to assist growth of the formation drainage area for hydrocarbon recovery improvement. Injected fluids recovered from both producers are collected for recycling.
Baker & Mckenzie Llp
Conocophillips Company
LandOfFree
Hydrocarbon recovery method does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Hydrocarbon recovery method, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Hydrocarbon recovery method will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1910868