E - Fixed Constructions – 21 – B
Patent
E - Fixed Constructions
21
B
166/16
E21B 33/13 (2006.01) E21B 7/00 (2006.01) E21B 17/00 (2006.01) E21B 29/10 (2006.01) E21B 33/14 (2006.01) E21B 43/10 (2006.01)
Patent
CA 1301635
ABSTRACT The method of well construction includes the steps of drilling the rock and consolidating it with a con- ductor casing, a surface casing string and a flow string, and isolating the troublesome zones of the well with profile pipes being reamed in the course of their setting. The reaming of the profile pipes is effected by building up a pressure drop across them and subsequently expan- ding them. The drilling of the rock after the casing-in of the well with the conductor casing and the surface casing string 19 performed with a bit of one and the same diameter, with the troublesome zones being reamed to a diameter equalling the outer diameter of the reamed profile pipes which are successively set in all the troublesome zones as they are exposed by the drilling.
588874
Abdrakhmanov Gabdrashit Sultanovich
Arzamastsev Filipp Grigorievich
Galiakbarov Vil Faizullovich
Ibatullin Rustam Khamitovich
Jusupov Izil Galimzyanovich
Marks & Clerk
Tatarsky Gosudarstvenny Nauchno-Issledovatelsky I. Proektny Inst
LandOfFree
Method of well construction does not yet have a rating. At this time, there are no reviews or comments for this patent.
If you have personal experience with Method of well construction, we encourage you to share that experience with our LandOfFree.com community. Your opinion is very important and Method of well construction will most certainly appreciate the feedback.
Profile ID: LFCA-PAI-O-1253301